Always park the chair at the top or bottom of the stairs to ensure continuous charging.
Verify that the carriage slows down smoothly and stops automatically at the terminal charging points.
Installing a ThyssenKrupp Levant stair lift requires precision, the right tools, and strict adherence to safety protocols. This comprehensive guide provides step-by-step instructions to assemble, mount, and test your straight stair lift system safely. 1. Pre-Installation Preparation
A: The standard Levant model reviewed in this article is for straight stairs only . For curved stairs, thyssenkrupp manufactures the "Flow" or "Flow2" series, which uses a different rail and drive mechanism specifically designed to navigate bends. thyssenkrupp levant stair lift installation manual
However, the most important maintenance task is performed by a professional. The manual explicitly states that . For North American users, it is required to carry out regular inspections and tests to Standard A18.1.10. To comply with these requirements please contact your supplier/ installation engineer.
Tighten the joint bolts securely using a torque wrench to the manufacturer's specified torque (typically 25-30 Nm). Step 3.3: Positioning and Securing Mounting Brackets
Measure the total length of the staircase from the nose of the top landing to the floor of the bottom landing. Always park the chair at the top or
Before starting, ensure that all parts are present and that the environment is ready for the lift.
Note: Thyssenkrupp Access (now part of TK Elevator/Access BDD) recommends that installation be performed by a qualified engineer or technician to ensure compliance with safety standards and maintain warranty validity. 1. Overview of the Levant Stair Lift System
Standard tools include a drill, screwdrivers, sockets, a tape measure, and a level. For curved stairs, thyssenkrupp manufactures the "Flow" or
The official installation manual provides detailed schematics and safety guidelines. Here is a simplified overview of the process: 1. Site Preparation and Safety Check Clear the staircase of all obstructions. Verify that the staircase structure is solid. Ensure the power supply is accessible. 2. Rail Assembly and Placement
The lift is parked off its charging station. Drive it to the very top or bottom until the beeping stops.
The following documents are included in the appendix:
The following is a detailed breakdown of the installation manual for the Thyssenkrupp Levant stair lift:
If you are in the process of choosing a stairlift, I can help by comparing the Levant with other models regarding: Optional features (e.g., power swivel) Installation time Share public link